Water Treatment Plant
Slurry drying
The solid residues from a water treatment works needs to be dried before processing further. A large canopy structure is used, with open ends and sides to give plenty of aeration.

The canopy allows complete drying even in inclement weather. With an eave height of 3m, machinery can easily work within the structure.

|
Leaf Grilles
A sewage treatment works surrounded by trees where the leaves continually blocked the system. So with a tunnel structure clad with netting the leaves no longer cause a problem.

Free ventilation but with no leaves.

For more pictures of water treatment visit our water treatment gallery page
|